Return to site

Days of the new ii

broken image
broken image

The eleven days referred to here are the ‘lost’ 11 days of September 1752, skipped when Britain changed over from the Julian calendar to the Gregorian calendar, bringing us into line with most of Europe. ‘Give us our eleven days!’ The English calendar riots of 1752.